Major Capital Improvements

Campus Numerous Roofing Projects througout Campus, ie Lee, York, Collins, Annex, etc.
In Progress
Campus Numerous Fire Sprinklers being installed in Residential Halls.
In Progress
Campus Chiller Replacement/Maintaince
In Progress
Campus Building Sealing/Pressure Washing In Progress
Campus Window Painting/Restoration on East Side of Campus
In Progress
Campus Matthews/Belknap Begin Remodel Carpet/Restrooms
In Progress
Sparks Pool Painting/Valve Replacement/Bleacher ADA Handrails, Clean/Caulk Exterior,
In Progress
Gatke Exercise Science Remodel/Exterior Window Painting
In progress
Campus Raindrain repair on Collins Science and East Side of Campus In progress
ACO Exterior Siding, Trim, Paint, Repairs and Replacements, Minor Roof Repairs
In Progress
DG Exterior Siding, Trim, Paint, Repairs and Replacements
Completed Summer 2009
McCulloch Stadium Elevator Upgrade Completed Summer 2009
Olin Fillback Completed Summer 2009
Olin Science NMR Lab Completed Summer 2009
Pi Phi Boiler Replacement Completed Summer 2009
SAE Abatement & Carpeting Completed Summer 2009
YWCA Senior Art Studio Relocation Completed Summer 2009
Sparks Pool Replace Pump Completed Summer 2009
Smith Auditorium Paint Roof, Add Railing and Replace Sanitary Sewer line Completed Summer 2009
Smullin/Walton Refurbish Windows 2009
Thetford Lodge Back Deck Refurbish Completed May 2009
Waller Hall Additional Offices 2009
West Side Campus Networking Infrastructure Completed Summer 2009

2008/2009 Projects

Fine Arts East Refurbish Room 102, Paint Interior, Replace Ceiling Tiles Completed September 2008
Smith Carpeting, Restroom, Gallery Refurbish, Carpeting In Progress
Putnam Elevator Jack Replacement in Service Elevator Completed Winter 2008/2009
YWCA North Exterior Reface Completed Summer 2008
Alpha Chi Remodel Rooms 11 and 12 Completed Summer 2008
Belknap Shower regrouting and Wall Repairs Completed Summer 2008
Doney Student Kitchen Remodel Completed Summer 2008
Kaneko A wing Repack Heating/Cooling Valves Completed Summer 2008
Pi Beta Phi Recarpet and Paint Sleeping Porches Completed Summer 2008
Sigma Chi Refurbish Basement Ceiling Completed Summer 2008
Court Street Apartment Rebuild Chimneys Completed Summer 2008